Standardization and Certification Study

title_05.gif

Activities and Result 2011

OSS Maturity Assessment
- To promote OSS adoption and application by providing users and software service providers with a practical reference
- Achievements: about 220 OSS has been assessed 2010-2011

OSS Repository
- To measure the quality of OSS by comparing and evaluating various properties

 

Activities and Result 2010

Establishment of OSS categories

Building evaluation categories and properties

Case study and trial (about 120 OSS)

Provision of common repository for CJK (The first version of Repository)

 

Activities and Result 2009

The Specification of the IM engine Service Provider Interface (NEAOSS/RD 004-1)

Report of Web interoperability discrepancy (WG3 TR 00003)

Solution of Web interoperability discrepancy (WG3 TR 00004)/p>

Close-out of SWG1 and SWG2
Their works were successfully accomplished, so WG3 decided to disband SWG1 and SWG2

 

sub10_73.gif

SWG1 (Input Method Engine Interface)
- 2007-12: Letter Ballot for the Draft-3
- 2008-03: Letter Ballot for Final draft
- 2008-07: Final Draft approved

SWG2 (Web Interoperability)
- 2007-09: TR-1 (Web discrepancy report) published
- 2008-10: TR-2 (Possible Solution) approved

WG3
- 2008-10: IME-SPI, TR-2 approval

 

sub10_71.gif

(1) WG3 has developed the second draft of "Specification of IM engine Service Provider Interface". Practicability of the specifications of the base design has been proved by the IM-BUS Project. WG3 will publish the specifications during 2008.
(2) WG3 developed the "Report of Web Interoperability Discrepancy". WG3 will publish this technical report during 2007. WG3 will also report possible solutions for Web interoperability discrepancies around the same time as publication of the above mentioned technical report.